2011.11.17 ~ 2011.11.19
開催地:国立天文台ハワイ観測所

The following is a program for this November Hilo meeting. We tried it as similar as possible to CoDR so that we were able to clarify what is ready and what has not yet been ready (and has to be done) for CoDR. On the second day of the meeting, we had “Special session dedicated to telescope interface issues” taking an advantage of having this meeting in Hilo.

Peter Gray kindly accepted to be an external adviser for this CoDR-Preparation meeting and gave us comments on this project.

■ プログラム ■
*** Nov 17 (Thu) ***
10:10 Informal session
Coordinate transformation and fiber positioning
PFI
Interface issues around the prime focus
Science requirements & baseline instrument capabilities etc.

12:00 lunch (catering service ordered)

13:00 coffee/tea

13:20 Opening remarks (PI)

13:30 Proposed CoDR objectives
Project office
including brief touching through program

13:45 Science requirements and Instrument requirements
Science team

15:00 Instrument overview
Project office
including throughput & S/N estimates

discussion on consistency with Instrument requirements

15:40 coffee/tea

16:00 Schedule, team organization, risk management, cost
Project office

16:40 Fiber
Brazil(Cesar, Ligia)
including fiber selection, microlens, fiber connector, slit block, fiber system integration

18:00

18:30 dinner at Imiloa Sky Garden Restaurant

*** Nov 18 (Fri) ***
8:40 coffee/tea

9:00 Fiber Positioner
Caltech/JPL
including prototypes, fiber routing, Cobra modules/bench, full scale production, positioiner movement planning software

9:40 PFI
Caltech/JPL
including field element, interface frame, A&G system, power distribution system, thermal control, mass & CG, integration

10:55 Spectrograph
LAM
including optical/mechanical design/analysis, back-illumination system, shutter, electrical/software design/analysis, spectrograph assembly/integration/test

12:10 lunch (catering service ordered)

13:30 Dewar & detector
Princeton / JHU
including detector procurement, opto-mechanical design, thermal design, electrical/software design

14:45 Metrology camera
ASIAA
including location, optical design/analysis, detector, mechanical design, fixed fiducial system, electrical design, prototype

16:00 coffee/tea

16:15 Special session dedicated to telescope interface issues
– Power supply
– Coolant supply
– Flat fielding
– Fiber route
(Further information on Subaru top-end inner ring:
“Inspection of Space Envelope on Telescope Top-end Inner Ring for FMOS Fiber Connector Assembly”
“Inspection of Space Envelope on Top-end Inner Ring
(including cable tray in IR-side spider)” only in Japanese)
– Instrument exchange on TUE floor
– Metrology camera location
– M3 floor reinforcement for spectrographs
– Environmental control of M3 floor for spectrographs

17:35 Comments from external adviser

18:00

18:30 dinner at Hilo Hawaiian Queens Court

*** Nov 19 (Sat) ***
8:40 coffee/tea

9:00 System software
Project office
including overall structure & design, system restrictions & requirements, software interface design, software development strategy & management

9:30 Data reduction software & Action Items for CoDR

Data reduction software

Comments from Princeton

Comments from LAM

Action Items for CoDR

- Finalizing CoDR objectives draft

- CoDR documents, CoDR dates/place

—> CoDR First draft deadline UTC 2011 Dec 9 23:59

- Deadline for cost estimate from each institution

—> UTC 2011 Dec 25 23:59

- The 2nd Collaboration meeting (Jan 8,9)

- Date of next technical collaborators’ telecon

—> UTC 2011 Nov 30 16:00

- Discussion on possibilities of high resolution spectrograph/mode

11:50 Closing remarks (PI)

12:00 lunch (catering service ordered)

12:00 – 14:30
Lunch & Lunch discussions on near future communication plan